PANEL

Variable speed drive project for high-power pump control in industry
- Rittal cabinet: Comprising 2 ABB frequency drives of 200 kW and 500 V.
- Rittal cooling system (8 kW): Optimises and reduces the temperature inside the cabinet.
- Siemens ET200 PLC: Controls the entire cabinet.
Project of 300 motor starters of 2.2 kW for a cooling bed of a hot rolling mill in the steel industry
- Rittal cabinet: Comprising 300 motor starters of 2.2 kW with reversing starters per group of 24 motors.
- Control: Provided by a Siemens ET200 PLC.
- Protection: Thermal and thermal-magnetic protection according to the roller beds.



Cabinet project for furnace control in the chemical sector
-
Rittal cabinet: Comprising a redundant Siemens ET200SP HA PLC on Profinet with fail-safe management.
Main switchboard and 3200 A grid decoupling cabinet for photovoltaic panels
- Eaton xEnergy cabinet: With IZMX16 and IZMX40 protection.
- Services: Engineering, assembly and copper forming

INDUSTRY

Bottom ash recovery site
Electrical revamping of the existing production line and the new pre-treatment section.
Replacement of cable trays on the existing installation and installation of new cable trays on the new sections.
Manufacture and installation of new electrical cabinets: pre-treatment, safety and lighting.
Compliance upgrade of the electrical cabinets that were retained.
Replacement of all cables (power, signals, data) and reconnection to the existing equipment from the electrical rooms.
Wiring of the new equipment installed on the new sections.
Installation of lighting and service sockets on the new sections.
Migration to a fail-safe PLC, integrating safety and process management within a single controller.
Recommissioning of the renovated production line.
Some figures
- Over 600 metres of cable trays installed on steel structures.
- Over 4 kilometres of cables installed.



Aerospace project
Complete electrification of a satellite testing process in a vacuum chamber
Supply of the project cabinets and on-site wiring in Germany.
Pulling of 550 metres of 120 and 185 mm² power cables and connection in the main switchboards
Mechanical installation of cable trays and approaches to the switchboards.
Furnace project
Objective: Implementation of the electrical system for an industrial furnace.
Supply of cabinets and main switchboards: Delivery and installation of electrical cabinets and main switchboards tailored to the specific needs of the furnace.
Cable pulling: Installation of control and power cables, providing the electrical connection between the various components of the system.
Substation wiring: Installation and electrical connection of the substation, guaranteeing the power supply required for the furnace to operate.
Complete mechanical installation of the furnace: Stainless steel cable trays.


ENERGY

Busbar project for a hotel in Brussels
- Implementation: Installation of 6 busbars from 250 A to 1000 A over a total length of 200 metres.
- Partnership: Carried out with our partner Siemens.
Medium-voltage protection project for 2 transformers at a pharmaceutical plant
- Assembly: Installation of a Schneider SM6 protection unit.


Replacement of 2 transformers at a cereal processing plant
- Replacement: Two dry-type transformers of 1600 kVA each.
- Customer constraint: As the customer could not shut down the installation for long, the work had to be completed in 1 day.
- Benefit: Using two transformers allows parallel operation and avoids stopping production during maintenance.
Pulling and connecting power cables to supply a substation
- Task: Pulling and connecting cables to supply a substation.