Busbar project for a hotel in Brussels
- Implementation: Installation of 6 busbars from 250 A to 1000 A over a total length of 200 metres.
- Partnership: Carried out with our partner Siemens.
Medium-voltage protection project for 2 transformers at a pharmaceutical plant
- Assembly: Installation of a Schneider SM6 protection unit.


Replacement of 2 transformers at a cereal processing plant
- Replacement: Two dry-type transformers of 1600 kVA each.
- Customer constraint: As the customer could not shut down the installation for long, the work had to be completed in 1 day.
- Benefit: Using two transformers allows parallel operation and avoids stopping production during maintenance.
Pulling and connecting power cables to supply a substation
- Task: Pulling and connecting cables to supply a substation.

You may also be interestedin these articles
30/08/2023
Maximising efficiency and profitability through 3D modelling
Optimising efficiency and profitability in industrial electrical engineering has reached a new level with the use of 3D modelling, in particular thanks to EPLAN Pro Panel.